πŸ—ΊοΈ BSP v4 Sitemap & Progress

British School Portal β€” Real-time Development Progress

Version: v4-0add3ad | Updated: 2026-06-25

46 / 76 items (61%)

🎯 🚨 Trial Readiness β€” School Pilot Q3 2026

4 HIGH4 MED5 LOW13 pages

BSP v4 needs 11 critical pages built before school pilot (Q3 2026). Auth / Intake / Review = transaction core (must build). Communicate = trust layer (can be skipped for trial). 2 school application pages just shipped (rev 3.0+).

  • πŸ”΄/school/applications🏫 School: Application Management (list view)List view with 4 seed apps + stats cards + click-through to detail
  • πŸ”΄/school/applications/:id🏫 School: Application Detail (review/approve/reject)Full P1-P5 phase UI β€” 16+ commits since 2026-06-15. School can advance through phases, view timeline, manage interview/deposit/travel/visa. Most action buttons are real now. Latest: rev 3.10 school P3 visual hierarchy mirror + rev 3.11 Β§17 Document Template System (per-file checkbox gate).
  • πŸ”΄/consultant/applicationsπŸ’Ό Consultant: Application Management (list)Page literally says "Under Construction 🚧"
  • πŸ”΄/consultant/applications/:idπŸ’Ό Consultant: Application Detail (status tracking)Page literally says "Under Construction 🚧"
  • 🟑/school/dashboard🏫 School: Dashboard (landing after login)6-stat header + 🎯 Needs Your Action + πŸ“ˆ Phase Distribution + recent apps + quick links
  • 🟑/consultant/dashboardπŸ’Ό Consultant: Dashboard
  • 🟑/school/profile🏫 School: Profile (school admin self-edit)
  • 🟑/consultant/profileπŸ’Ό Consultant: Profile
  • 🟒/school/reports🏫 School: Reports (analytics)Skip for trial β€” schools can ask BSP team manually
  • 🟒/school/partnerships🏫 School: Partnerships (B2B connections)Skip β€” not in school trial flow
  • 🟒/consultant/reportsπŸ’Ό Consultant: ReportsSkip for trial
  • 🟒/consultant/partnershipsπŸ’Ό Consultant: PartnershipsSkip for trial
  • 🟒/business-portal/*🏒 Business Portal (3 pages) β€” Dashboard / Profile / PartnershipsNot in trial scope β€” defer to Q4

πŸ“Š Portal Completion Rates

🎯🚨 Trial Readiness β€” School Pilot Q3 202623%
3 / 13 done πŸ“ Draft
🌐Public58%
7 / 12 done πŸ“ Draft
πŸ”Authentication100%
4 / 4 done
πŸŽ“Student Portal100%
7 / 7 done
πŸ”§Operations Portal100%
6 / 6 done
βš™οΈBSP Admin Portal100%
12 / 12 done
🏫School Portal63%
5 / 8 done πŸ“ Draft
πŸ’ΌConsultant Portal0%
0 / 6 done πŸ“ Draft
🏒Business Portal0%
0 / 3 done πŸ“ Draft
πŸ“œLegal & Info0%
0 / 3 done πŸ“ Draft
πŸ”¨BSP Development100%
2 / 2 done

πŸŽ“ Application Phases

1
Application Submitted
Student submits application with required documents and personal statement
2
Interview & Assessment
School reviews application and conducts interview or entrance assessment
3
Offering
School sends deposit form, student pays and uploads proof, school confirms
4
Admission Documents
Collect official documents, references, medical forms, and agreements
5
Pre-Departure
CAS letter issued, visa application, and travel arrangements

πŸ• Recent Updates

  • 2026-06-25Document Template System rev 3.11 (Β§17) β€” schools now upload real PDF/image files to /school/settings/document-templates. On P3/P4/P5 phase enter, queue auto-pre-fills from templates (blue 'πŸ“‹ from template' badge). Per-file checkbox 'Send to student?' gates the Send/Add/Upload action.
  • 2026-06-25P3 visual hierarchy mirror (rev 3.8-3.10, Β§16.0.1 + Β§16.0.2) β€” both student and school P3 now use 3-card visual hierarchy (readonly gray / upload green / gated blue) with action-oriented purpose text. Pills: 🟒 upload, βšͺ read, πŸ”΅ action, 🟑 payment.
  • 2026-06-24P3 entry state β€” student sees πŸŽ‰ celebration + ⏳ waiting banner when school hasn't sent documents yet (rev 3.5, Β§16.2). School sees entry hint before sending.
  • 2026-06-24Student Dashboard built β€” welcome page with stats (Total / Pending / Review / Offer) + per-school P1-P6 progress bars + quick links (rev 3.0.4, Β§15.7)
  • 2026-06-24P2 cross-portal change request reception β€” school sees 3-way status pill + inline message block + auto-opens modal on first view (rev 3.0.3, Β§15.6 + Β§15.6.1 bridge)
  • 2026-06-22School Dashboard built β€” 6 stats + needs-action + phase distribution + recent apps + quick links (responsive 6β†’3β†’2 col)
  • 2026-06-22P5 Step 3 / Step 4 are now independent β€” no Step 3 gate (rev 3.5). School can complete them in any order.
  • 2026-06-22Fix dev shortcut: devAdvanceToP4 now uses p3store API so p3gate unlocks P4+P5 (P5 substep UI was hidden before)
  • 2026-06-22P5 Travel Arrangements refactored to two-section model β€” ✈️ Flight (visa applicants only) + πŸš— Transportation (mode + ETA required)
  • 2026-06-19Disabled sub-step UX (Β§18.4) + dev affordance panel (Β§21) β€” clearer hints for locked buttons
  • 2026-06-17Application Detail rev 3.0 β€” 6-phase pipeline + Document Templates + visaRequested field
  • 2026-06-15School applications list + detail page shipped β€” full P1-P5 phase UI, 4 seed apps, Stripe deposit flow
  • 2026-06-15Apply to School (student side) + Stripe Payment page shipped β€” 1 happy path complete
  • 2026-06-15Student Profile + My Applications (collaborative) shipped
  • 2026-06-14Settings + Users pages (BSP Admin portal) complete β€” 13 admin pages done
  • 2026-06-08Operations portal (6 pages) + Public pages (Homepage, Search, BSP Landing, Consultants, News) shipped
  • 2026-06-07Trial readiness audit: marked 13 critical pages needed before school pilot
  • 2026-06-05Architecture update: remove dead Operations links, add Business Portal, reorganise portals per latest spec
  • 2026-06-04Apply to School: multi-file document upload with drag-drop, reorder, and inline rename
  • 2026-06-03Add Student Profile page - personal info, documents, guardian, academic tabs
  • 2026-06-03Update My Applications - collaborative platform with messaging & document requests
  • 2026-05-31Update roadmap: remove AI features, keep existing v4 + non-AI planned items
  • 2026-05-28Redesign Sitemap with real v4 progress & per-portal progress bars
  • 2026-05-28Add Roadmap page with three-column kanban-style board
  • 2026-05-21Unify Settings sidebar CSS & fix Promo Codes indentation
  • 2026-05-21Fix missing links & duplicate Promo Codes in sidebars
  • 2026-05-20Add /BSP/users/business Business User Management page
  • 2026-05-20Add company address field for Consultant & Business registration
  • 2026-05-19Add school address field to School registration form
  • 2026-05-18New registration flow: payment + Manager approval workflow
  • 2026-05-16Add /operations/applications Manager approval page

🌐 Public

7/12

πŸ” Authentication

4/4

πŸŽ“ Student Portal

7/7

πŸ”§ Operations Portal

6/6

βš™οΈ BSP Admin Portal

12/12

🏫 School Portal

5/8

πŸ’Ό Consultant Portal

0/6

🏒 Business Portal

0/3

πŸ“œ Legal & Info

0/3

πŸ”¨ BSP Development

2/2

🏁 Milestones

2026-06-25
Document Template System rev 3.11
Schools pre-upload real files to /school/settings/document-templates. P3/P4/P5 phase queues auto-pre-fill from templates; per-file 'Send to student?' checkbox gates the actual send action. Replaces the rev 3.0 placeholder-only checklist model.
2026-06-22
P5 Travel Arrangements Two-Section Refactor
P5 Step 3 split into ✈️ Flight (visa only) + πŸš— Transportation (mode + ETA). Step 3/4 made independent (rev 3.4 β†’ rev 3.5)
2026-06-17
Application Detail rev 3.0
6-phase pipeline + Document Templates + visaRequested field. P1-P5 fully functional with real action buttons
2026-06-15
Critical Path Complete (Trial MVP)
Student β†’ School β†’ Apply β†’ School Review β†’ Stripe Deposit β†’ Done. 5 critical school-side pages shipped, 21 pages still stubs (consultant + business + legal)
2026-06-08
Operations + Public Portals Live
All 6 operations pages + 8 public pages (homepage, search, consultants, news, business profile) shipped
2026-06-07
Trial Readiness Audit Complete
13 pages identified as blockers for Q3 school pilot. Trial module added to sitemap for tracking.
2026-06-05
Architecture Finalisation
Updated v4 architecture: removed dead Operations links, added Business Portal, reorganised per latest spec
2026-06-03
Student Portal Complete
Student Profile + collaborative My Applications - all 5 student portal pages done
2026-05-31
v4 Roadmap Update
Remove AI features from roadmap; keep existing v4 + non-AI planned items
2026-05-28
Sitemap & Roadmap Redesign
Real-time progress tracking with per-portal completion rates
2026-05-20
Business Users & Address Fields
Business user management + company/school address in registration
2026-05-16
Manager Approval Workflow
Payment + Manager approval for new registrations
2026-05-13
Settings Pages + Promo Codes
Fee/Staff/Website settings + standalone Promo Code management
2026-04-29
Clean Header Rollout
Unified white header across all public pages
2026-04-20
Payment & Dashboard v2
Payment page rebuild + BSP Dashboard redesign

πŸ“ˆ Development Stats

46Completed
0In Progress
30Draft
0Planned
78Vue Files
76Total Items
61%Overall